Recently we loaded another container of used tyres to Gambia. For this, we used our COT-8 tyre loading press and COT-20 loading ramp, both of which we manufacture in-house. Before using these two pieces of equipment, 6 people were needed for loading. Loading took between 5 and 7 hours. Today, using our equipment, 2 men load a container in 4 hours. The number of loaded tyres has increased from 2700 to 3300. Do not hesitate to contact us about your purchase!
Mobile: +48 692 106 909
E-mail: info@coton-export.com